Taking into account the general luggage of knowledges on the problem of
the submarine mining, accumulated in times of work on a subject in summer 2004
work the customer of which was the Nikolaevskiy aluminous factory (NAF) was
executed (Theme ¹070518). Work consisted in the ground and choice of shallow
dredge and pipeline system for mining works at the slime theckener of NAF
cleaning. On a project, the following was executed:
1. The ground
and choice of motion methods taking into account the specific terms of slime
theckener is executed.
2. Taking into account basic data,
in accordance with requirement specification got from a customer, are grounded and chosen: type of shallow
dredge and his productivity, mechanisms for the working moving, pipeline
system.
3. Technology of at the slime
theckener of NAF cleaning is developed.
4. The ekonomical calculations of
capital and operating costs of customer are executed.
5. The questions of accident
prevention, labour and environment protection at the submarine mining works in slime
theckener of NAF are lighted up.